- Overview
- Product Description
- Detailed Photos
- FAQ
Basic Info.
Model NO.
ID03
Door Core Material
Honey Paper
Veneer Material
Three-Ply Board
Open Style
Automatic
Function
Gas Tight Door, Water Tight Door
Inner Frame Layout
as The Picture
Inner Frame Material
Mixed Inner Frame
Mixed Inner Frame
Aluminum Plate and Wood
Wooden Inner Frame
Wood Grafting
Position
Interior
Surface Finishing
Finished
MOQ
100
Term
Fob
Color
Wood
Supply Ability
10
Brand Name
Ech
Transport Package
Box Packing
Specification
as the picture
Trademark
HM
Origin
China
HS Code
83412100
Production Capacity
10, 000
Packaging & Delivery
Package Size
150.00cm * 50.00cm * 50.00cm
Package Gross Weight
50.000kg
Product Description
Welcome to Shine On
Welcome a trial order (small quantity no problem)
If you want more style, please contact us at any time!
Type | Gate door |
Brand NamE | ECH |
Place of Origin | Jiangmen China (Mainland) |
Model Number | ID03 |
Material | Stainless Steel 201/304, Zinc alloy, Customization |
Finish & Size | Galvanized arm, brushed decorative cover |
Standard export package: | polyfoam bag+PVC bag+inner box+carton(PVC bag and inner box we also can print customer's Logo) |
Delivery | 30 working days |
1) Are you a factory or trading company?
A: We are a trading company, We expert in door and window hardware since 2013, enjoy more than 10 years export history.
2) How can I get a sample to check your quality?
A:After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and papel quality, we can try our best to apply a sample for free, but you need to afford the express freight.
3) How long can I expect to get the sample?
A:After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.
4) How long does the whole procedure being worked out?
A:After you place a order, the production handling time is about 20-30days.
We need 15 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
A:Normally we use shipment to transport the goods.it is about 15-20days.it also depends on which country and port you are.lt could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
6) When can I get the price?
A:We usually quote within 24 hours after we get your inguiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inguiry priority.
7) What is the MOQ?
A:MOQ=500pcs, better price with more quantity.
8) How does your factory do regarding quality control?
A:Quality is priority. Our workers always attach great importance to Quality control from the very beginning to the very end.Each products will be inspected carefully before packing.